panorama.

Sturgis Road Construction Update

Sturgis Road/Highway 79 North is scheduled to be reconstructed between Cheryl Lane and Foothills Road in Black Hawk during Summer of 2010. This is the final stretch of road construction on the rebuild of Highway 79 North linking Black Hawk and Summerset with a beautiful 4 lane highway. Construction time is estimated to be considerably shorter than for previous stretches of the road construction. During this time there will continue to be access to Summerset Storage units.




6101 Cheryl Lane • Highway 79 NORTH - (Between Black Hawk and Summerset)
Site Design by: Access Logo,